EN
.
42
12. Associations
Use associations for direct communication between the Flush 2 Relay and other devices within
your Z-Wave network without the need of your primary gateway (hub).
Association Groups:
Root device:
•
Group 1: Lifeline group (reserved for communication with the primary gateway (hub)), 1 node
allowed.
•
Group 2: Basic on/off (status change report for Q1 load), up to 16 nodes.
•
Group 3: Switch binary report (status change report for Q1 load), up to 16 nodes.
•
Group 4: Power meter report (power consumption report of Q1 load at status change), up to 16
nodes.
•
Group 5: Basic on/off (status change report for Q2 load), up to 16 nodes.
•
Group 6: Switch binary report (status change report for Q2 load), up to 16 nodes.
•
Group 7: Power meter report (power consumption report of Q2 load at status change), up to 16
nodes.
•
Group 8: Multilevel sensor report (external temperature sensor report
–
sensor sold separately),
up to 16 nodes.
End point 1 (Wall Switch I1):
•
Group 1: Lifeline group, 0 nodes allowed.
•
Group 2: Basic on/off (status change report for Q1 load), up to 16 nodes.
•
Group 3: Switch binary report (status change report for Q1 load), up to 16 nodes.
•
Group 4: Power meter report (power consumption report of Q1 load at status change), up to 16
nodes.
End point 2 (Wall Switch I2):
•
Group 1: Lifeline group, 0 nodes allowed.
•
Group 2: Basic on/off (status change report for Q2 load), up to 16 nodes.
•
Group 3: Switch binary report (status change report for Q2 load), up to 16 nodes.
•
Group 4: Power meter report (power consumption report of Q2 load at status change), up to 16
nodes.
End point 3 (External Temperature Sensor):
•
Group 1: Lifeline group, 0 nodes allowed.
•
Group 2: Multilevel sensor report (external temperature sensor report
–
sensor sold separately),
up to 16 nodes.
Summary of Contents for Flush 2 relay
Page 17: ...EN 17 4 Package Contents Flush 2 Relay Device Installation Manual...
Page 24: ...EN 24 After Qubino installation...
Page 25: ...EN 25 3 WAY INSTALLATION WITH 2 SWITCHES CONTROLLING THE SAME LIGHT Before Qubino installation...
Page 26: ...EN 26 After Qubino installation when power line and load line are in the same switch box...
Page 27: ...EN 27 After Qubino installation when power line and load line are in different switch boxes...
Page 28: ...EN 28 Before Qubino installation Where there is no neutral line N in switch box...
Page 29: ...EN 29 After Qubino installation Where there is no neutral line N in switch box...
Page 36: ...EN 36 Step 5 Turn the fuse on Step 6 Re include the device to your network...
Page 37: ...EN 37 Step 7 Start using the temperature sensor in connection with your device...