Replacements
BES X installation manual
128
P/N: 400288005; Rev: L, 09/21
Click
OK
.
Click on
Yes
when the Warning message appears.
Wait for Conqueror X to process the request;
NOTE
: This procedure will take almost an hour to finish. DO NOT switch off the BES X system during this
process.
When the whole process is complete, a confirmation message (Lane control box replaced) will
appear. Press
OK
.
How to upload animations to the 4HD/5HD-CPU units
to correctly upload the animations
to the new 4HD/5HD-CPU.
16.3
How to replace an EasyKey console
Turn off the 4HD/5HD-HUB by unplugging the power cord from the 4HD/5HD-HUB unit to turn off the pair of
lanes where the faulty EasyKey console is installed;
Disconnect and remove the faulty EasyKey console from the pedestal;
Fix and connect the new EasyKey console in the same way as the old one;
Check that all the cables are connected;
Turn on the new 4HD/5HD-HUB.
16.4
How to replace a SuperTouch console
Turn off the 4HD/5HD-HUB by unplugging the power cord from the 4HD/5HD-HUB unit to turn off the pair of
lanes where the faulty SuperTouch console is installed;
Disconnect and remove the faulty SuperTouch console from the pedestal;
Fix and connect the new SuperTouch console in the same way as the old one;
Check that all the cables are connected;
Turn on the new 4HD/5HD-HUB.
Wait until
Test LCD R Error 199
or
Test LCD L Error 199
appears on the overhead monitors, or when the lane
boots-up properly.
Navigate through the Conqueror X main menu and select:
SETUP
/
Lane
Setup
/
Upload to Lanes
.
Summary of Contents for 400288005
Page 1: ...P N 400288005 REV L 09 21...
Page 24: ...Electrical specifications BES X installation manual 14 P N 400288005 Rev L 09 21...
Page 94: ...Front Desk BES X installation manual 84 P N 400288005 Rev L 09 21...
Page 114: ...System first start up BES X installation manual 104 P N 400288005 Rev L 09 21...
Page 141: ...BES X installation manual Parts P N 400288005 Rev L 09 21 131...