Unpacking the DXi6900
Quantum DXi6900 Installation Guide
10
Unpacking the DXi6900
By following these unpacking instructions, you help ensure that the system will continue to be safeguarded
after it arrives at the installation site:
l
Unpacking the DXi6900 Node on the next page
l
Unpacking the Additional Node Components on page 12
l
Unpacking the DXi6900Array Module or Expansion Module on page 13
Caution:
Make sure to retain all packing materials, as well as the documentation and other items
included in the shipping box. The packaging materials must be used if the system is relocated.
WARNING:
The DXi6900 G1 Node (including hard drives) weighs 53.0 pounds (24.0 kg). The
DXi6900 G2 Node (including hard drives) weights 49.3 pounds (22.4 kg). A minimum of two people are
required to lift the chassis.
Unpacking the DXi6900 Node
The box containing the DXi6900 Node contains the following items:
Item
Descriiption
Rack mount rails
Includes cable management straps.
Accessory kit
Includes the following:
l
DXi6900 User Essentials
l
Product Installation Instructions card
l
Quantum Products Regulatory Documentation CD
l
Registration (Warranty) card
Base Node kit
Includes the following:
l
C13 to C14 power cord (2)
l
North American power cord (2)
l
Cable, CAT6, RJ45, non-plenum, blue solid, 25 feet (3)
Cable kit Fibre Channel HBA
Includes the following:
(DXi6900 G1) Cable, 10 GB, 6 meter (6)
(DXi6900 G2) Cable, 12 GB, 6 meter (4)
Node bezel and bezel keys
A network cable kits ships with the Node in a separate box, depending on configuration (see
Additional Node Components on page 12
).