Unpacking the DXi6900-S
Quantum DXi6900-S Installation Guide
8
Item
Description
Rack mount rails
Includes cable management straps.
Accessory kit
Includes the following:
l
DXi6900-S User Essentials
l
Product Installation Instructions card
l
Quantum Products Regulatory Documentation CD
l
Registration (Warranty) card
l
Grounding strap
Base Node kit
Includes the following:
l
C13 to C14 power cord (2)
l
North American power cord (2)
l
Cable, CAT6, RJ45, non-plenum, blue solid, 25 feet (3)
Cable kit Fibre Channel HBA
Includes the following:
Cable, 12 GB, 6 meter (4)
Node bezel and bezel keys
A network cable kits ships with the Node in a separate box, depending on configuration (see Unpacking the
Additional DXi6900-S Node Components
).
Carefully unpack and remove the components from the packing materials (see Figure 1 on the next page).