
FORM QTC2-eg1 (515)
QUANTECH
71
PART 3 - EXECUTION
3.01 Installation
A. General: rig and install in full accordance with manufacturers requirements, Project
drawings, and Contract documents.
B. location: locate chiller as indicated on drawings, including cleaning and service main-
tenance clearance per manufacturer instructions. Adjust and level chiller on support
structure. if equipment provided exceeds height of scheduled chiller, installing contrac-
tor is responsible for additional costs associated with extending the height of parapet
or screening walls/enclosures
C. Components: installing Contractor shall provide and install all auxiliary devices and
accessories for fully operational chiller.
d. Electrical: Coordinate electrical requirements and connections for all power feeds with
Electrical Contractor (division 16).
E. Controls: Coordinate all control requirements and connections with Controls Contrac-
tor.
f.
Finish: Installing Contractor shall paint damaged and abraded factory finish with touch-
up paint matching factory finish.
Guide Specifications (Cont'd)
Summary of Contents for QTC2015T
Page 4: ...QUANTECH FORM QTC2 eg1 515 4 This Page Intentionally Left Blank...
Page 12: ...QUANTECH FORM QTC2 eg1 515 12 This Page Intentionally Left Blank...
Page 25: ...FORM QTC2 eg1 515 QUANTECH 25 Unit Dimensions English Cont d QTC2025T LD18674...
Page 33: ...FORM QTC2 eg1 515 QUANTECH 33 45 1 8 18 1 2 LD18682 Unit Dimensions English Cont d QTC2045T...
Page 47: ...FORM QTC2 eg1 515 QUANTECH 47 Unit Dimensions Metric Cont d QTC2045T 424 LD18702...
Page 57: ...FORM QTC2 eg1 515 QUANTECH 57 Power Wiring LD18707...
Page 58: ...QUANTECH FORM QTC2 eg1 515 58 LD18744 Power Wiring Cont d...
Page 59: ...FORM QTC2 eg1 515 QUANTECH 59 Power Wiring Cont d LD18746...
Page 60: ...QUANTECH FORM QTC2 eg1 515 60 Factory wired with optional transformer LD03611 Control Wiring...