Page 30
7047-148C
December 20, 2011
R
51I ACC Wood Insert
G. Tools And Supplies Needed
Before beginning the installation be sure the following tools
and building supplies are available:
Reciprocating saw
Framing material
Pliers
High temp caulking material
Hammer
Gloves
Phillips screwdriver
Framing square
Flat blade screwdriver Electric drill and bits
Plumb line
Safety glasses
Level
Tape measure
1/2-3/4 in. length, #6 or #8 self-drilling screws
Misc. screws and nails
H. Fire Safety
To provide reasonable fire safety, the following should be
given serious consideration:
1. Install at least one smoke detector on each floor of
your home to ensure your safety. They should be
located away from the heating appliance and close
to the sleeping areas. Follow the smoke detector
manufacturer’s placement and installation instructions,
and be sure to maintain regularly.
2. A conveniently located Class A fire extinguisher
to contend with small fires resulting from burning
embers.
• Remove appliance and components from packaging and
inspect for damage.
• Vent system components and doors are shipped in
separate packages.
• Report to your dealer any parts damaged in shipment.
• Read all the instructions before starting the
installation. Follow these instructions carefully
during the installation to ensure maximum safety and
benefit.
I. Inspect Appliance and Components
1.
Place the appliance in a location near the final
installation area and follow the procedures below:
2.
Open the appliance and remove all the parts and
articles packed inside the Component Pack. Inspect
all the parts and glass for shipping damage. Contact
your dealer if any irregularities are noticed.
3.
All safety warnings have been read and followed.
4.
This Owner’s Manual has been read.
5.
Floor protection requirements have been met.
6.
Venting is properly installed per vent manufacturing
instructions.
7.
The proper clearances from the appliance and chim
-
ney to combustible materials have been met.
8.
The masonry chimney is inspected by a professional
and is clean, or the factory built metal chimney is
installed according to the manufacturer’s instruc
-
tions and clearances.
9.
The chimney meets the required minimum height.
10.
All labels have been removed from the glass
door.
11.
Plated surfaces have been wiped clean, if appli
-
cable.
12.
A power outlet is available nearby for use of the
blower assembly.
Inspect appliance and components for damage.
Damaged parts may impair safe operation.
WARNING
• Do NOT install damaged components.
• Do NOT install incomplete components.
• Do NOT install substitute components.
Report damaged parts to dealer.
Fire Risk.
Pre-Burn Check List