
1.
Open the feeder and push the left of the upper blue release lever to raise the upper
drive assembly.
2.
Pull up the brush release lever.
3.
Raise the brush and lift the complete brush holder assembly.
4.
Lift the metal retainer to remove the sponge.
Remember its direction.
5.
Clean the sponge and the brush.
6.
Re-install the sponge and retainer.
7.
Put the brush back and push the release lever back down until it snaps into place.
12
Maintaining
your
Mailing
System
289
| Page 289 | Jun-21-2021 12:11 |
Summary of Contents for iX-5 Series
Page 1: ...User Guide iX 5 Franking Machine ...
Page 5: ... Page 4 TOC Jun 21 2021 12 11 ...
Page 7: ......
Page 15: ......
Page 17: ......
Page 33: ......
Page 97: ......
Page 99: ......
Page 109: ......
Page 111: ......
Page 125: ......
Page 167: ......
Page 169: ......
Page 175: ......
Page 177: ......
Page 192: ...Content 8 Reports 187 Page 187 Jun 21 2021 12 11 ...
Page 195: ......
Page 197: ......
Page 237: ...3 Press OK to validate 232 Page 232 Jun 21 2021 12 11 10 Configuring your Mailing System ...
Page 238: ...Geodesic map 10 Configuring your Mailing System 233 Page 233 Jun 21 2021 12 11 ...
Page 239: ...Geodesic codes 234 Page 234 Jun 21 2021 12 11 10 Configuring your Mailing System ...
Page 259: ......
Page 283: ......
Page 303: ......
Page 305: ......
Page 319: ......
Page 327: ...A0139556 B 22 06 2021 ...
Page 328: ...A0139556 B 22 06 2021 ...