3 Product Installation
Please ensure that you have carefully read Chapter 2 and make sure that the requirements set forth in Chapter 2
have been met.
3.1 Installation Flowchart
Mount the switch to the rack
Connect the system grounding
Connect the power supply
Connect interface cables
Bundle the power cables or optical fibers
Installation check
3.2 Pre-installation Confirmation
Before installation, please confirm the following points:
Whether sufficient airflow is available for the switch
Whether the requirements of the switch for temperature and humidity are met
Whether power cables are already laid out and whether the requirements of electrical current are met
Whether related network cables are already laid out
3.3 Installing the Switch
Precautions
During installation, note the following points:
Connect the power cables of different colors to the corresponding grounding posts.
Ensure that the connected power cables have sound contact.
Do not place heavy items on the switch.
Reserve a spacing of at least 10 cm around the chassis for good ventilation. Do not stack the devices.
The switch should be located far away from the large power radio launch pad, radar launch pad, and
high-frequency large-current devices. If necessary, electromagnetic shielding should be adopted. For example,
use interface cables to shield cables.
Interface cables should be laid inside the equipment room. Outdoor cabling is prohibited, avoiding damages to