
Operation Manual
GEM and GEM PRO
OMiQGEM-L Issue.02
Page 32 of 51
i-Q SERIES
Note: The i-Q Series consists of many replaceable parts. Any replaceable part must be supplied by QED or an
authorized representative and will come with a specific set of instructions for its replacement. For technical
support, please contact QED or an authorized representative.
For further help, please refer to our i-Q Help Page:
BATTERY PACK REPLACEMENT
The i-Q battery pack is user replaceable. It can be changed quickly and easily while in the field, including when in
a hazardous area. To replace the battery:
1)
Ensure the instrument is switched off.
2)
Using the supplied tool, select the Phillips No. 1 screwdriver and unscrew the four battery pack screws and
remove them from the case back
–
see
Note: The battery pack screws are retaining and should remain part of the pack.
Figure 9
–
Battery Removal
3)
Place the replacement battery pack (QED part number PMMPB) into the case back recess. It will only fit
one way and will automatically align itself.
4)
Using the supplied tool, select the Phillips No. 1 screwdriver, and secure the battery pack in place.
5)
i-Q is now ready to be switched on and used.
Note: If the PMMPB battery is removed, the backup coin cell will maintain time/date settings and CO (H
2
compensated) cell conditioning for approximately 10 minutes. After this time, the user will have to reset the time
& date and CO (H
2
compensated) cell conditioning will be affected, meaning the user may need to allow the cell
to stabilize for 24 hours before use.
Note: It is the opera
tor’s responsibility to keep a record of when and what maintenance has been performed.
iQV14
Summary of Contents for LANDTEC i-Q Series
Page 1: ...Operation Manual GEM and GEM PRO...
Page 12: ...Operation Manual GEM and GEM PRO OMiQGEM L Issue 02 Page 12 of 51 GEM VS GEM PRO...
Page 21: ...Operation Manual GEM and GEM PRO OMiQGEM L Issue 02 Page 21 of 51 iQV07 iQV08 iQV09...
Page 22: ...Operation Manual GEM and GEM PRO OMiQGEM L Issue 02 Page 22 of 51 iQV10...
Page 28: ...Operation Manual GEM and GEM PRO OMiQGEM L Issue 02 Page 28 of 51 Figure 7 i Q Setup...
Page 30: ...Operation Manual GEM and GEM PRO OMiQGEM L Issue 02 Page 30 of 51 Flow Chart 2...
Page 48: ...Operation Manual GEM and GEM PRO OMiQGEM L Issue 02 Page 48 of 51 WARRANTY INFORMATION...
Page 49: ...Operation Manual GEM and GEM PRO OMiQGEM L Issue 02 Page 49 of 51...