background image

Valid for North America

INSTALLATION AND

OPERATION MANUAL

Q.PEAK DUO XL-G10.2 / G10.c solar module series

Summary of Contents for Q.PEAK DUO XL-G10.c

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G10 2 G10 c solar module series...

Page 2: ...are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation and mai...

Page 3: ...ble documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT US...

Page 4: ...tress free expansion and contraction due to tem perature fluctuations Ensurethatnoadditionalforcesareappliedthroughthemounting system into the module except for the wind and snow loads Additional forc...

Page 5: ...YSTEM INSTALLATION ON MOUNTING POINTS INSTALLATION WITH INSERTION PROFILES NOT PERMITTED TRACKER INSTALLATION ON MOUNTING POINTS TB1a 35 8 908 TB2a 35 8 908 35 8 28 1 17 9 908 713 454 TB1b 28 1 713 TB...

Page 6: ...the module TC1 Ensure minimum support depth of 12mm on the backside and 10mm on the front side of the module FB1 FB2 TB1a TB2a TB1b TB2b mFB2 Use M8 corrosion proof screws and washers diameter 15 8mm...

Page 7: ...ng factor of 125 percent 80 percent derating which might be applicable Please follow the valid national guidelines for the installation of electrical systems refer to section 690 8 of the NEC for an a...

Page 8: ...out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION confirmation let...

Page 9: ...Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter Make sure th...

Page 10: ...ick click DANGER Risk of fatal injury due to electric shock Ensure that all electrical components are in a proper dry and safe condition SOLAR 4 ELECTRICAL CONNECTION 4 3 CONNECTION OF MODULES DANGER...

Page 11: ...and backing nut Care should be taken to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Q CELLS modules can be bonded wi...

Page 12: ...ing to the state of the art and taking into account all relevant safety issues and general product properties e g but not restricted to electrical safety mechanical stability load limits depending on...

Page 13: ...ithout notice Q CELLS Installation manual solar modules Q PEAK DUO XL G10 2_G10 c_2022 01_Rev02_NA 24 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q PEAK DUO XL G10 2 G10 c Q CELLS Free the substru...

Reviews: