INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2_G10.c – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2_G10.c – Q CELLS

2  PLANNING

2.3  MOUNTING OPTIONS

TYPE OF
INSTALLATION

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

INSTALLATION 
WITH INSERTION 
PROFILES

TRACKER 
INSTALLATION
ON MOUNTING
POINTS

TRACKER 
INSTALLATION
WITH CLAMPS

TB1a

908

EN

TB2a

EN

908

908 /

713 /

454

EN

TB1b

713

TB2b

EN

713

713 /

454

TC1

908 - 
958

EN

IP1

IP2

2  PLANNING

2.3  MOUNTING OPTIONS

Specifications

MODULE TYPE

MOUNTING
OPTION

POSITION OF CLAMPS* 
[MM]

TEST LOAD 
PUSH / PULL**  [PA] 

DESIGN LOAD 
PUSH / PULL**  [PA] 

SAFETY 
FACTOR

Q.PEAK DUO XL-G10.2

Q.PEAK DUO XL-G10.c

FB1

454

5400 / 3000

3600 / 2000

1.5

CL1a 

300 - 550

5400 / 2400

3600 / 1600

FB2

454

3600 / 3000

2400 / 2000

mFB2

454

3400 / 3000

2260 / 2000

CL3 / mCL3

300 - 550

3600 / 3000

2400 / 2000

IP1

-

TB1b

713

TB2b

Outer side: 713
Inner  side:  713 / 454

CL1b

300 - 550

3000 / 2400

2000 / 1600

TB1a

908

2500 / 2400

1660 / 1600

TB2a

Outer side: 908
Inner  side:  908 / 713 / 454

2700 / 2400

1800 / 1600

CL5

short side: 20 - 100
long side: 400 - 550

3000 / 2400

2000 / 1600

 

Ä

The below mounting options are only possible under certain conditions.

MODULE TYPE

MOUNTING 
OPTION

POSITION OF CLAMPS* 
[MM]

TEST LOAD 
PUSH / PULL***  [PA] 

DESIGN LOAD 
PUSH / PULL***  [PA] 

SAFETY 
FACTOR

Q.PEAK DUO XL-G10.2

Q.PEAK DUO XL-G10.c

TC1

908 - 958

2400 / 2200

1600 / 1460

1.5

CL1a

20 - 550

2400 / 2000

1600 / 1330

CL2a (with 

rails)

20 - 100****

2400 / 1600

1600 / 1060

CL2b (with-

out rails)

20 - 100

1600 / 1600

1060 / 1060

*
** 
***
****

Distance between outer edge of module and middle of the clamp (see table „2.3 Mounting Options“ on page 7); consider further details below. 
Loads according to IEC 61215-2:2016 and UL 61730. 
Test procedure according to IEC 61215-2:2016 and UL 61730. Loads for these mounting options do not fulfill the requirements of the standards.
Rails must not be under the junction box.

Summary of Contents for Q.PEAK DUO XL-G10.2

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G10 2 and Q PEAK DUO XL G10 c solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...uch as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and r...

Page 3: ...egardingregulationsandpermitrequirements prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYP...

Page 4: ...l requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient r...

Page 5: ...0 3600 3000 2400 2000 IP1 TB1b 713 TB2b Outer side 713 Inner side 713 454 CL1b 300 550 3000 2400 2000 1600 TB1a 908 2500 2400 1660 1600 TB2a Outer side 908 Inner side 908 713 454 2700 2400 1800 1600 C...

Page 6: ...en laminate and mounting rails CL1b CL2b CL3 mCL3 FB2 mFB2 A minimum support depth of 15mm is required on the back side of the module CL5 The minimum required support depth on the module backside is 1...

Page 7: ...dules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse curre...

Page 8: ...shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger R...

Page 9: ...s may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire...

Page 10: ...d skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 co...

Page 11: ...TER INSTALLATION Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction Ensure that cables are protected from abrasion tension compression an...

Page 12: ...rface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of th...

Page 13: ...ual solar modules Q PEAK DUO XL G10 2_G10 c_2022 01_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 E...

Reviews: