background image

4

5

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2_G10.c – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2_G10.c – Q CELLS

Validity

These instructions are only valid for crystalline solar modules from 
the company Q CELLS as specified at chapter „2.1 Technical 
Specifications“. 
Q CELLS assumes no liability for damage resulting 
from failure to observe these instructions.

 

Ä

Please observe the wiring and dimensioning of the system.

 

Ä

The installer of the system is responsible for compliance with all 
necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 
Q CELLS is only liable in the context of contractual agreements 
or in the context of accepted guarantees. Q CELLS accepts no 
other responsibility for the functionality and safety of the modules.

 

Ä

Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system. 
It may be necessary to carry out a structural analysis for the 
entire project.

Additional information for the Operator

 

Ä

Please keep this manual for the entire life of the solar power 
system.

 

Ä

Please contact your system supplier for information concerning 
the formal requirements for solar power systems.

 

Ä

Please be sure to contact the relevant local authorities and 
energy providers regarding regulations and permit requirements 
prior to installation of the solar power system.

Other applicable documents

In addition to this Manual following technical information are 
relevant:

DOCUMENT TYPE

Product data sheet

Packaging and transport information

1  INTRODUCTION

2  PLANNING

2.1  TECHNICAL SPECIFICATIONS

For additional information see the relevant datasheet of the module provided at www.q-cells.com.

PRODUCT LINE

Q.PEAK DUO XL-G10.2
Q.PEAK DUO XL-G10.c

Type

Q.ANTUM DUO Z

Length

2216 mm

Width

1045 mm

Frame height

35 mm

Area

2.32 m²

Weight

26.5 kg

Max. system voltage V

SYS

1500 V  (IEC) / 1500 V  (UL)

Max. reverse current

20 A

Permissible 

temperature range

–40 °C to +85 °C (–40 °F to +185 °F)

Junction box 

protection class

≥ IP67 with bypass diode

Connector protection class

IP67 or IP68

Fire rating

C / Type  1

Max. test load Push / Pull

1

5,400 Pa / 3,000 Pa

Max. design load Push / Pull

1

3,600 Pa / 2,000 Pa

Middle rail

Yes

Certificates

Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC 61730:2016; PV 
module classification: Class II; UL 61730

1

 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)

Fig. 1: 

External dimensions (in mm) and components for 
Q.PEAK DUO XL-G10.2 and Q.PEAK DUO XL-G10.c

1045 mm

1308 mm

2216 mm

790 mm

35 mm

4 × Mounting slots (DETAIL A)

8 × Drainage holes

3 × 6 mm  

Frame

1003 mm

AU/
EN

454 mm

Label

4 × Grounding holes, Ø 4.5 mm

4 × Drainage holes

≥ 700

 mm

4 × Mounting slots system Tracker (DETAIL B)

DETAIL A

16 mm

8.5 mm

21

 mm

DETAIL B

10 mm

7 mm

22

 mm

1001 mm

≥ 350

 mm

400 mm

Summary of Contents for Q.PEAK DUO XL-G10.2

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G10 2 and Q PEAK DUO XL G10 c solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...uch as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and r...

Page 3: ...egardingregulationsandpermitrequirements prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYP...

Page 4: ...l requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient r...

Page 5: ...0 3600 3000 2400 2000 IP1 TB1b 713 TB2b Outer side 713 Inner side 713 454 CL1b 300 550 3000 2400 2000 1600 TB1a 908 2500 2400 1660 1600 TB2a Outer side 908 Inner side 908 713 454 2700 2400 1800 1600 C...

Page 6: ...en laminate and mounting rails CL1b CL2b CL3 mCL3 FB2 mFB2 A minimum support depth of 15mm is required on the back side of the module CL5 The minimum required support depth on the module backside is 1...

Page 7: ...dules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse curre...

Page 8: ...shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger R...

Page 9: ...s may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire...

Page 10: ...d skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 co...

Page 11: ...TER INSTALLATION Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction Ensure that cables are protected from abrasion tension compression an...

Page 12: ...rface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of th...

Page 13: ...ual solar modules Q PEAK DUO XL G10 2_G10 c_2022 01_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 E...

Reviews: