background image

4

5

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G8.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G8.X – Q CELLS

Validity

These instructions are only valid for crystalline solar modules from 
the company Q CELLS as specified at chapter „2.1 Technical 
Specifications“. 
Q CELLS assumes no liability for damage resulting 
from failure to observe these instructions. 

 

Ä

Please observe the wiring and dimensioning of the system.

 

Ä

The installer of the system is responsible for compliance with all 
necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 
Q CELLS is only liable in the context of contractual agreements 
or in the context of accepted guarantees. Q CELLS accepts no 
other responsibility for the functionality and safety of the modules. 

 

Ä

Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system. 
It may be necessary to carry out a structural analysis for the 
entire project. 

 

Ä

If your questions are not satisfactorily answered in the manual, 
please contact your system supplier.

Additional information for the Operator

 

Ä

Please keep this manual for the entire life of the solar power 
system.

 

Ä

Please contact your system supplier for information concerning 
the formal requirements for solar power systems.

 

Ä

Please be sure to contact the relevant local authorities and 
energy providers regarding regulations and permit requirements 
prior to installation of the solar power system. Your financial 
success depends on the fulfillment of these requirements.

Other applicable documents

In addition to this Manual following technical information are 
relevant:

DOCUMENT TYPE

Product data sheet

Packaging and transport information

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS 
THE LIMITED WARRANTY AND MAY CREATE A SAFETY 
HAZARD AND RISK PROPERTY DAMAGE. THIS INCLUDES 
IMPROPER INSTALLATION OR CONFIGURATION, IMPROPER 
MAINTENANCE, UNINTENDED USE, AND UNAUTHORIZED 
MODIFICATION.

Fig. 1: 

External dimensions (in mm) and components for 
Q.PEAK DUO L-G8, Q.PEAK DUO L-G8.3, 

1030 mm

1308 mm

2080 mm

35 mm

4 × Mounting slots (DETAIL A)

8 × Drainage holes

3 × 6 mm  

Frame

DETAIL A

16 mm

8.5 mm

25.5

 mm

979 mm

DETAIL B

10 mm

7 mm

25

 mm

4 × Mounting slots system Tracker (DETAIL B)

980 mm

400 mm

AU/
EN

386 mm

Label

4 × Grounding holes, Ø 4.5 mm

≥ 1400 mm

4 × Drainage holes

≥ 1400 mm

For additional information see the relevant datasheet of the module provided at www.q-cells.com.

PRODUCT LINE

Q.PEAK DUO L-G8

Q.PEAK DUO L-G8.1

Q.PEAK DUO L-G8.2

Q.PEAK DUO L-G8.3

Type

Q.ANTUM DUO

Q.ANTUM DUO

Q.ANTUM DUO

Q.ANTUM DUO

Length

2080 mm

2080 mm

2080 mm

2080 mm

Width

1030 mm

1030 mm

1030 mm

1030 mm

Frame height

35 mm

35 mm

35 mm

35 mm

Area

2.14 m²

2.14 m²

2.14 m²

2.14 m²

Weight

24.5 kg

25.0 kg

25.0 kg

24.5 kg

Max. system  

voltage V

SYS

1000 V  (IEC) / 
1000 V  (UL)

1000 V  (IEC) / 
1000 V  (UL)

1500 V  (IEC) / 
1500 V  (UL)

1500 V  (IEC) / 
1500 V  (UL)

Max. reverse current

20 A

20 A

20 A

20 A

Permissible  

temperature range

–40 °C to +85 °C (–40 °F bis +185 °F)

Junction box  

protection class

≥ IP67 with bypass diode

Connector protection 

class

IP67 or IP68

Fire protection class

C / Type  2

C / Type  2

C / Type  1

C / Type  1

Max. test load  

Push/Pull

1

5,400 Pa / 2,400 Pa

5,400 Pa / 2,400 Pa

5,400 Pa / 2,400 Pa

5,400 Pa / 2,400 Pa

Max. design load  

Push/Pull

1

3,600 Pa / 1,600 Pa

3,600 Pa / 1,600 Pa

3,600 Pa / 1,600 Pa

3,600 Pa / 1,600 Pa

Middle rail

No

Yes

Yes

No

Certificates

CE-compliant; IEC 61215:2016; IEC 61730:2016; Application Class II; UL 1703

1

  Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)

1  INTRODUCTION

2  PLANNING

2.1  TECHNICAL SPECIFICATIONS

Fig. 2: 

External dimensions (in mm) and components for 
Q.PEAK DUO L-G8.1, Q.PEAK DUO L-G8.2,  

1030 mm

1308 mm

2080 mm

35 mm

4 × Mounting slots (DETAIL A)

8 × Drainage holes

3 × 6 mm  

Frame

DETAIL A

16 mm

8.5 mm

25.5

 mm

979 mm

DETAIL B

10 mm

7 mm

25

 mm

4 × Mounting slots system Tracker (DETAIL B)

980 mm

400 mm

AU/
EN

386 mm

Label

4 × Grounding holes, Ø 4.5 mm

≥1400 mm

4 × Drainage holes

≥1400 mm

Summary of Contents for Q.PEAK DUO L-G8 Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO L G8 X solar module series Valid for Africa Europe LatinAmerica South America ...

Page 2: ...pment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs Any valid international national and regional regulations governing work ...

Page 3: ...OPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Fig 1 External dimensions in mm and components for Q PEAK DUO L G8 Q PEAK DUO L G8 3 1030 mm 1308 mm 2080 mm 35 mm 4 Mounting slots DETAIL A 8 Drainage holes 3 6 mm Frame DETAIL A 16 mm 8 5 mm 25 5 mm 979 mm DETAIL B 10 mm 7 mm 25 mm 4 Mounting slots system Tracker D...

Page 4: ...ply with any applicable laws and stipulations as well as with the following Conform to the necessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the façade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corro...

Page 5: ...lity of the mounting system including clamps has to be evaluated by the system supplier The Q CELLS listed test load values were determinded with the following clamp parameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements Ä Ä Ensure that the subconstruction does not touch the junction box even under load Ensu...

Page 6: ...verse currents caused by module defects ground leaks or defective insulation Ä Ä Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout with a limited number of parallel connected strings Withoutundertakingfurthercurrentblockingmeasures amaximum of two module...

Page 7: ...ule damage may occur Ä Ä Never step on modules Ä Ä Do not subject modules to any mechanical stress Ä Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fatal injury due to electric shock Ä Ä Block off the installation zone Ä Ä Keep children and unauthorized individuals away from the solar power system Danger Risk of fatal injury due to electric s...

Page 8: ...m the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Ä Ä Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Ä Ä Pleasefollowthevalidnationalregulationsandsafetyguidelines for the installation of electrical devices and systems Ä Ä Please make sure to...

Page 9: ...es proceed in reverse order Danger Risk of fatal injury due to electric shock Ä Ä Electrical work may only be performed by qualified and skilled personnel see page 3 Ä Ä Ensure correct polarity Ä Ä Use solar cables for the connection at the junction box outlet Ä Ä Use the same inverter compatible plugs Ä Ä Use minimum 4mm2 copper wires insulated for a minimum of 90 C for field connections Note Mod...

Page 10: ...ry regulations Functional grounding For installations located in tropic regions between 23 5 N and 23 5 S with a module tilt of 5 functional grounding at the negative generator connection on the DC side must be implemented Ä Ä Ensure that the difference of potential between the negative generator connection and the local earth potential e g substructure PE of the inverter on each string in operati...

Page 11: ... or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Ä Ä Never access the installation area alone or without taking adequate security precautions Ä Ä Please commission a trade specialist NOTE Module surface damage may occur Ä Ä Remove snow and ice carefully without force e g with a very soft broom Ä Ä Do not scratch off dirt Ä Ä Rinse dirt dust leaves etc off ...

Page 12: ...ee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO L G8 X_2019 05_Rev01_EN ...

Reviews: