4
INSTALLATION AND OPERATION MANUAL FOR FLAT ROOF SYSTEM Q.FLAT-G6 – Q CELLS
2
REQUIRED MATERIAL
REQUIRED
OPTIONAL
A
Start, end
and connection profile
O
1
First connector in
direction of rails
B
Main base profile
O
2
First connector in
direction of module
C
10° base
O
4
SOLMONT incl. USO connection
D
Connecting base profile
O
5
Ballast block
E
10° tower
O
6
Middle and
end clamps for ballast
F
Cross brace and ballast
brace
O
7
Ballast trough V01 / V02
V01: Assembly after adding the bulk material
V02: Assembly before adding the bulk material
G
Cross brace connector
O
8
Side cover 10°
H
Module clamp as middle and
end clamp
O
9
Cable duct cover