INSTALLATION AND OPERATION MANUAL FOR FLAT ROOF SYSTEM Q.FLAT-G6 – Q CELLS
4
ASSEMBLY
4.7 OPTIONAL STEP
4.7.2 CABLE DUCT COVER O
9
In order to protect the string lines from permanent and damaging environmental influences, especially UV radiation, all Q CELLS
base rails have receptacles for cable duct covers. The installation of the cable duct covers is possible after each work step of the
system assembly.
INFO
i
When attaching the cable duct, take care not to damage the string lines.
PRELIMINARY WORK:
Check clean position of string lines; check permanent and secure fastening of string lines so as to
avoid damage to lines due to movements (wind).
PROCEDURE:
Place the cable duct cover
O
9
in the lower guide groove on the main base profile
B
; tilt the cable duct cover
O
9
onto the upper guide
groove; load the cable duct cover
O
9
centrally until the click latch engages with an audible noise.
CLICK!
ATTENTION
!