MR2 Manual
Revision B
/
June 2021
Page 17
of
34
7.
Install the fluid distribution block. The pins in the valve body will align the sections.
Figure 26: Fluid Distribution Block
Note: Make sure the fluid distribution block is installed so the fluid outlet is on the
same side as the etched part number on the valve stop.
Figure 27: Correct Installation of the Fluid Distribution Block
8.
Install the six M4x25 bolts in the top of the valve
stop. Tighten the bolts in an “X”
pattern until they are tight.
Figure 28: Tighten the Bolts in a Cross Pattern