Fix the PV panel to Rail, via Universal Inter Clamps and End Clamps step by step until all the panels complete.
Recommended torque for M8 bolts is 18~20 N·m.
- Installation Instruction -
5. ECO-Rail Installation
Uplift the Cross Connection Clamp in the certain angle. Click the Clamp into the ECO-Rail. Position the Rail in the
middle of the Rectangular Tube-Master, and then fasten the M8*70 bolt.
Recommended torque for M8 bolts is 18~20 N·m.
Note:
ECO-Rail of 3150 mm is a standard length in this system, which can be suitable for up to 1002 mm wide panel. If the
panels are over 1002 mm (less than 1100 mm) wide, the required minimum rail length is: (panel width-1002)*3+3150
(mm). For example, panels are 1050 mm wide. The required minimum rail length is (1050-1002)*3+3150 = 3294 mm. For
convenience, the rail length is rounded up to 3300 mm (multiple of 50 mm).