Installation Guide / PostMount 3-A for XL Panels
1
Code-Compliant Planning and Installation Guide V 1.1 - Complying with AS/NZS1170.2-2011 ADMT 4-2016
Introduction
Complying with all applicable local or national
building codes, including any updates that may
supersede this manual;
Ensuring that PV-ezRack® and other products are
appropriate for the particular installation and the
installation environment;
Using only PV-ezRack® parts and installer supplied
parts as specified by PV-ezRack® project plan
(substitution of parts may void the warranty and
invalidate the letter of certification);
Recycling: Recycle: according to the local relative
statute;
Ensuring that there are no less than two professionals
working on panel installation;
Ensuring the installation of related electrical
equipment is performed by licenced electricians;
Ensuring safe installation of all electrical aspects of
the PV array, including providing adequate earth
bonding of the PV array and PV-ezRack® PostMount
components as required in AS/NZS 5033: 2021.
•
•
•
•
•
•
•
The installer is solely responsible for:
List of contents
Introduction
Tools & Components
System Overview
Installation Instruction
Certification
01
02
03 - 05
06 -11
12 -15
Clenergy PV-ezRack® PostMount 3-A for XL Panels (up to
2100 x 1100 mm) is a ground mounting system suitable
for large scale commercial and utility scale installations.
PVezRack ® PostMount 3-A for XL Panels has been
developed to fit any PV module in the outdoors and
uneven ground areas. PVezRack ® PostMount 3-A for XL
Panels have good compatibility for the different region
via the angle adjustment (10°~60°). Using high quality
engineered components PostMount 3-A for XL Panels
saves developers and installers, time and money when
delivering large scale projects.
Please review this manual thoroughly before installing
PostMount 3-A for XL Panels. This
manual provides the following contents:
1) Installation planning;
2) Installation instructions.
- Introduction -
The PV-ezRack® PostMount 3-A for XL Panels parts,
when installed in accordance with this guide, will be
structurally adequate and meet the AS/NZS1170.2:2011
Admt 4-2016 standard. During installation, and
especially when working on the ground, please comply
with the appropriate occupational health and safety
regulations. Please also pay attention to other relevant
regulations in your local region. Please check that you
are using the latest version of the installation manual by
contacting Clenergy via email on www.clenergy. com.
cn.or contacting your local distributor.
Product Warranty:
Please refer
website.