32
Take the two wires and pass them through the cable grommet located on the same side where the link board
housing is installed. Connect the two wires to their respective terminals.
Once the wires are outside the
furnace, run them along the
back of the furnace and pass
them through the bottom cable
grommet of the link board
housing.
Complete
the
installation by plugging the 8
threads
wire
in
the
right
connector shown by the right
arrow and plug the other wire in
the connector shown by the left
arrow.
Summary of Contents for CADDY ALTERNA II
Page 83: ...83 12 EXPLODED VIEWS AND REPLACEMENT PARTS...
Page 84: ...84 SECTION A SECTION B...
Page 85: ...85 SECTION C SECTION D...
Page 86: ...86 SECTION E SECTION F...
Page 87: ...87 SECTION G SECTION H...
Page 88: ...88 SECTION I SECTION J...
Page 89: ...89 SECTION K SECTION L...
Page 90: ...90 SECTION M SECTION N...
Page 91: ...91 SECTION O...
Page 92: ...92 HARNESS SECTION...
Page 93: ...93...
Page 94: ...94 TELECOMMUNICATION WIRES SECTION...
Page 95: ...95...
Page 96: ...96...
Page 97: ...97...
Page 101: ...101 13 GENERAL ELECTRIC DIAGRAM...
Page 104: ...104 15 3 HOT WATER OPTION 15 4 24V ADDITIONAL EQUIPMENT 15 5 AIR CONDITIONING DAMPER...
Page 105: ...105 15 6 HUMIDIFIER 15 7 HEAT PUMP...