Installation
22
22
3. INSTALLATION
Before installing, removing, inspecting, or performing any maintenance on the
hoist, the main switch must be de-energized, locked out, and tagged out.
Do not use this equipment in hazardous locations.
Installation Process:
• Electric chain hoists must be grounded properly.
• Lock-out and tag-out the main disconnect switch in de-energized position before performing any service on hoist.
• Customer must provide power supply cable, fuses, and main disconnect switch.
• Check supply voltage is same as nameplate voltage on hoist.
• Ensure that the voltage does not vary by more than ±10% from nominal value.
• Do not use conductors smaller than those listed in this User Manual to supply power to hoist.
• Never bypass limit switches, remove limit switch stops, or alter limit switch devices.
Hoist should be carefully inspected upon delivery for any damage that may have occurred during shipment or handling. Check
the hoist frame for: dents or cracks, external cords for damaged or cut insulation, control station for cut or damaged enclosure,
and load chain for nicks and gouges.
Check and document hoist characteristics:
a. Model number
b. Rated capacity (tonnage)
c. Lifting length of load chain (meter)
d. Power supply
e. Push button pendant assembly (2 button, 4 button or 6 button)
f. Specially ordered optional items
g. Beam width for trolley installation
3.1 Unpacking
1 Chain bag (box)
1pcs
2 Control wire rope
1 m
3 Button switch
1 pcs
V.07.22 [LA]
Summary of Contents for PWJTHF
Page 2: ...This page intentionally left blank...
Page 19: ...Version 1 0 19 Specifications 19 V 07 22 LA...
Page 20: ...Version 1 0 Specifications 20 20 V 07 22 LA...
Page 33: ...Version 1 0 33 Parts 33 1 4 Trolley assembly drawing V 07 22 LA...
Page 49: ...49 Wiring Diagram 49 7 CONVENTIONAL HOIST WIRING DIAGRAM PWJTHF PWJTHT V 07 22 LA...