Page 18 of 68
Proton Products InteliSENS DG1130 Diameter Gauge Instruction Manual (Issue 1a)
•
Ensure that all cable shields are correctly clamped and electrically connected to their
connectors and metal connector shells at both ends.
•
Ensure that the shields of cables connecting to the end user’s equipment are clamped to
earth at their destination.
Optional CDI4 interface display unit installation
The CDI4 interface display unit is a recommended optional accessory with the following features:
•
Menu based user interface for configuring the gauge and displaying measurements and error
messages.
•
Two versions of the CDI4 interface display are available: one version that mounts directly on
the gauge body and one version that can be connected remotely via a CAN-bus extension
cable.
•
The remote CDI4 interface display unit can also power DC powered gauges through a CAN-
bus port connected power supply.
Installing a CDI4 display unit to DG1130 gauge head:
1
Unscrew the four screws and remove the CDI4
port blanking plate.
Store the blanking plate and four countersunk
screws for future use.
2
Align the CDI4 connector mating key with
the port socket and insert.
Secure the CDI4 unit with four spring
washers and M4 cap head screws.
Installing a remote CDI4 interface display unit:
1. Connect the remote CDI4 interface display unit to the CAN/POWER connector using a CAN-
bus extension cable.
2. Connect an optional PSU-CAN mains power supply unit to the second CAN-bus port on the
remote CDI4 interface display unit.