6
General Notes
•
Every effort has been made to ensure that the equipment outlined reflects the actual
equipment expected to be installed. The equipment is positioned in such a manner as to
provide optimum operation. The customer shall bear the sole responsibility for compliance
with all applicable codes, OSHA, NEMA, local and national standards.
• Expressed or implied on the part of ProSun®, its dealers, distributors or other designated
agents, shall be contingent upon strict compliance with electrical, structural, and
mechanical recommendations contained in this manual unless specified otherwise in the
equipment sales order.
• The customer is responsible for all room preparation, costs, fees, permits, and inspections
unless specified otherwise in the general order for equipment purchased.
• ProSun®, its dealers, distributors or designated agents shall supply all interconnecting
cables required for the equipment installation and setup. Additional power, grounding or
ancillary equipment shall be the responsibility of the customer unless specified otherwise
in the equipment sales order.
• Equipment installation cannot begin until the room is complete and ready for equipment
installation. To include; contractors equipment, electrical requirements and room
construction.
• ProSun®, its dealers, distributors or designated agents shall reserve the right to refuse to
install and equipment into any room which has not been properly prepared in accordance
with these general notes.
• All electrical work shall conform to the requirements of the national electrical code, OHSA
or applicable local and or state ordinances, as well as, utility company rules regarding
ampere interruption and safety shunt trip switches and power panels of which shall bear
the label of underwriter's laboratories, incorporated and shall be permanently marked for
easy identification.
• All wires shall be single solid runs without splices meeting the NEMA standards
•
The electrical contractor shall provide and install all electrical material as specified for a
safe operating system.
•
The electrical contractor shall provide and install all electrical material as specified for a
safe operating system.
• The electrical shall ring out, tag, and terminate all wires at both ends, with each run to be
inspected to ensure that no wires have been grounded or are open.
• The customer shall provide a dedicated power source when called for by ProSun®, its
dealers, distributors or other designated agents.
• ProSun®, its dealers, distributors or other designated agents are not responsible for
the final installation of the electrical system. The recommended electrical plan must be
coordinated between the customer and the electrical contractor. Any deviation of the
electrical plan before, during, and after equipment installation is the responsibility of the
customer.
• The electrical contractor shall ensure the completion of all electrical requirements prior or
the installation of any ProSun® system.