
43
Managing the Pegasus R4i
Pegasus R4i Product Manual
Managing Background Activities
Background activity management includes:
•
“Viewing Current Background Activities”
•
“Viewing Scheduled Background Activities”
•
“Adding a Scheduled Background Activity”
•
“Changing a Background Activity Schedule”
•
“Enabling or Disabling a Scheduled Background Activity”
•
“Deleting a Scheduled Background Activity”
•
•
•
•
•
•
•
•
Background activities perform a variety of preventive and remedial functions on your physical drives,
disk arrays, logical drives, and other components.
You can run a background activity immediately or schedule it to run at a later time. Scheduling options
are described below.
Setting options for each activity are listed after the scheduling options. These settings determine how
the background activity affects I/O performance.