![Promise Technology E310f Product Manual Download Page 267](http://html.mh-extra.com/html/promise-technology/e310f/e310f_product-manual_1617210267.webp)
Chapter 8: Troubleshooting
253
See “Critical & Offline Disk Arrays” on page 276 for a discussion of rebuilding and
failed disk drives.
Back of Enclosure
When the FRU Status LED on VTrak’s front panel shows Amber or Red, check
the LEDs on the back of VTrak. These LEDs give the status of the field
replaceable units.
Figure 4. VTrak E310f rear view
LEDs
State
Dark
Steady
Green
Flashing
Green
Amber
Red
Power/
Activity
No Drive
Drive
Present
Activity
Status
No Power/
No Drive
Drive OK
Drive
Rebuilding
Drive
Error
Mgmt
UPS
115200
8 N 1
FC 1
FC 2
4
2
1
Gb/s
4
2
1
Gb/s
Mgmt
UPS
115200
8 N 1
FC 1
FC 2
4
2
1
Gb/s
4
2
1
Gb/s
O
I
O
I
Cooling Unit 1
with Battery
Power Supply 1
RAID Controller 1
Power Supply 2
Cooling Unit 2
with Battery
RAID Controller 2
Summary of Contents for E310f
Page 1: ...VTRAK E Class E310f and E310s PRODUCT MANUAL Version 1 1 ...
Page 14: ...VTrak E Class Product Manual xiv ...
Page 22: ...VTrak E Class Product Manual 8 ...
Page 58: ...VTrak E Class Product Manual 44 ...
Page 61: ...Chapter 4 Management with WebPAM PROe 47 Figure 1 The WebPAM PROe log in screen ...
Page 218: ...VTrak E Class Product Manual 204 ...
Page 234: ...VTrak E Class Product Manual 220 Figure 13 Replacing the VTrak controller ...
Page 304: ...VTrak E Class Product Manual 290 ...
Page 316: ...VTrak E Class Product Manual 302 ...