![Promise Technology E310f Product Manual Download Page 25](http://html.mh-extra.com/html/promise-technology/e310f/e310f_product-manual_1617210025.webp)
Chapter 2: VTrak Installation
11
6.
Attach a two-hole flange to the rail, with the flange toward the back
(connector end) of the enclosure.
Install four rail adjustment screws (included) through the flange into the rail.
7.
Repeat steps 4 through 6 to attach the other rail and flanges to the
enclosure.
8.
Place the enclosure with mounting rails into your rack system.
9.
Attach the four-hole flanges to the inside of the rack’s front post, using the
attaching screws from your rack system.
10. Attach the two-hole flanges to the inside of the rack’s rear post, using the
attaching screws from your rack system.
11. Square the rails in the rack.
12. Tighten the adjustment screws and the attaching screws.
Figure 2. Rack mount assembly diagram
Inside of post
Rack front post
Rail attaching screw
(not included)
Rail adjustment screw
Rail
Rail attaching screw
(not included)
Inside of post
Rack back post
Plate
Front flange
Rail adjustment screw
Rear flange
Summary of Contents for E310f
Page 1: ...VTRAK E Class E310f and E310s PRODUCT MANUAL Version 1 1 ...
Page 14: ...VTrak E Class Product Manual xiv ...
Page 22: ...VTrak E Class Product Manual 8 ...
Page 58: ...VTrak E Class Product Manual 44 ...
Page 61: ...Chapter 4 Management with WebPAM PROe 47 Figure 1 The WebPAM PROe log in screen ...
Page 218: ...VTrak E Class Product Manual 204 ...
Page 234: ...VTrak E Class Product Manual 220 Figure 13 Replacing the VTrak controller ...
Page 304: ...VTrak E Class Product Manual 290 ...
Page 316: ...VTrak E Class Product Manual 302 ...