Secure the support roller (P) into place. Use a wrench to
tighten down the 2 hex head bolts.
Attach the bar stop to the vise:
Insert the thread end of the long rod (R) into the side of
the vise.
Turn the long rod clockwise until snug.
Use a hex wrench 5mm to lock the screw M12x10 (Q) on
the sleeve counter-clockwise, so that bar stop unit is
secure.
Assemble the coolant tank:
Insert the coolant pump (X) into the coolant tank (T).
Apply an M6 washer to each of 2 M6x20 screws (U).
Secure pump (X) to tank (T) with prepared screws (U).
Place the hose clamp (V) onto the flow tube (W).
Connect the flow tube (W) to the hose connector (V).
Use a flat head screwdriver to tighten the hose clamp (V).
Install the coolant tank:
Orient the coolant pump (X) towards the rear opening o
machinge stand.
Place the coolant tank (1A) onto the coolant platform (H).
The coolant tank (1A) contains a divider that forms a trough
in the bottom of the tank. This trough fit over the vertical lip
of the coolant platform (H).
Insert one end of the 0.5” drain hose (Y) onto the hose
connector (1B) on the underside of the machine base.
Place the other end into the insert (Z) of the coolant tank (1A).
Attach the rear plate to the back of the stand:
Place rear plate (1C) across the back of the machine stand.
Align the plate holes (1D) with the set of 4 holes towards the
top of the machine stand.
Apply an M8 washer to each of 4 M8x25 screws.
Secure with 4 screws and washers.
Q
9
Summary of Contents for SY-350V
Page 74: ...SY 350V 74...
Page 75: ...SY 350V 75...