![Profroid QUIETCO2OL MC OUTDOOR Operating Instructions Manual Download Page 77](http://html1.mh-extra.com/html/profroid/quietco2ol-mc-outdoor/quietco2ol-mc-outdoor_operating-instructions-manual_1613095077.webp)
71
REFRIGERATION NETWORK CONNECTION
Before any work is done on the refrigeration circuit, the holding charge must be
removed.
In order to get rid of this neutral gaz, it is necessary to vacuum the whole installation.
The piping used must be of copper refrigeration quality in accordance with PED 2014/68/EC
and EN12735-1.
All piping must be correctly supported and fixed and should in no case be allowed to restrict
the operation of the gas cooler unit. For the connection of piping, protect sensitive
components located around the permanent assemblies to be made.
The products added for thermal and /or acoustic insulation must be neutral with respect to
support materials.
The protection devices, piping’s and accessories must be protected against unfavorable
effects from the environment.
Reverse-trap
Evaporator higher than the unit.
P-trap
Suction line
Evaporator lower than the unit
Suction line
P-trap
5 m max height
difference