NOTICE D’INSTRUCTIONS GENERALE POUR
COFFRETS ET ARMOIRES ELECTRIQUES
V3.0
Page 46 / 51
27)
COMISSIONING OPERATIONS
-
Before any electrical connection, ensure that the main supply voltage and frequency
correspond to the indications of the electrical diagram page OP 10 .
-
Any wiring done on site must be compliant with official standards of the country (including
earthing).
-
Before supplying power to the equipment, check :
o
That the connections are made correctly,
o
That all screws on equipments are correctly tightened.
-
In resident area, when the installation has frequency converters, the installer will have to
look at the necessity to have or not a RFI net filter.
-
Do not use equipments or control panels for another installation than the one they are
designed for..
-
Please comply with components manufacturers recommendations, especially the ones written
in the user manuals and operating instructions.
-
Motor protections must be set on site to the nominal current, indicated on each
motor plate.
-
Frequency converters can create on installations resonance vibrations on pipes. The
installer will have to remove those frequencies, by adjusting frequency converter
settings.