PortaNet User Manual
4 of 156
VIII.2.1.1
LAN port................................................................... 51
VIII.2.1.2
ISDN Terminal adaptor Configuration ................................. 56
VIII.2.1.3
RS232 Port ................................................................ 58
VIII.2.1.4
GPIO Port.................................................................. 58
VIII.2.2
System Configuration
61
VIII.2.2.1
TimeDate.................................................................. 64
VIII.2.2.2
Password .................................................................. 64
VIII.2.2.3
Aux Data .................................................................. 65
VIII.2.2.4
Software Versions........................................................ 66
VIII.2.2.5
Alarms ..................................................................... 66
VIII.2.2.6
Backup..................................................................... 67
VIII.2.2.7
Phone Book ............................................................... 67
VIII.2.2.8
Scheduler ................................................................. 68
VIII.2.2.9
Advanced.................................................................. 68
VIII.2.2.10
Exporting / Importing the configuration............................ 69
VIII.2.3
Streaming
69
VIII.2.3.1
Protocol ................................................................... 70
VIII.2.3.2
Tx .......................................................................... 70
VIII.2.3.3
Rx .......................................................................... 73
VIII.2.3.4
Test ........................................................................ 73
VIII.2.3.5
Real Time Monitoring.................................................... 75
VIII.3 Call Log
76
VIII.4 Keypad locking
78
VIII.4.1
Locking the keypad from the Portanet keyboard
79
VIII.5 Audio control keypad
79
VIII.6 Scheduler
80
VIII.6.1
Configuration
80
VIII.6.2
How to enable/disable the Scheduler
80
VIII.6.3
Automatic and manual call
81
VIII.6.4
Programming the scheduler
81
VIII.6.5
Name
82
VIII.6.6
Start
82
VIII.6.7
Priority
82
VIII.6.8
End
82
VIII.6.9
Scheduled call configuration
85
VIII.6.9.1
Manual configuration .................................................... 85
VIII.6.9.2
Automatic configuration from the phone book...................... 86
VIII.6.10
Modifying existing scheduled calls
86
VIII.6.11
Deleting existing scheduled calls
86
VIII.6.12
Copying and pasting scheduled calls
86
VIII.6.13
Monitoring scheduled calls
87
VIII.7 Controlling the PortaNet
88
VIII.7.1
Selecting the NET interface
88
VIII.7.2
Configuring the Encoder
88
VIII.7.3
Making calls:
89
VIII.7.4
Disconnecting the Line
92
Summary of Contents for PortaNet
Page 77: ...PortaNet User Manual 77 of 156 ...
Page 135: ...PortaNet User Manual 135 of 156 ...