ASSEMBLY OF THE STRUCTURE (cont.)
IMPORTANT!
Before you begin to install the liner locking track, check that the structure was correctly assembled.
- Using a spirit level, go around the entire structure checking that it is horizontal.
- Check that the four diagonals are equal in length.
- Correct any defects.
Recommendations:
-The liner locking track should be fitted such that it is flush with the top of the wooden structure.
-Use junction pieces between each liner locking track section.
-Check the length of liner locking track required before cutting.
-Pre-drill the walls using a Ø 3mm drill bit and fix the liner locking track in position.
-Avoid over tightening, this could cause the screws to break through the track.
refer to the illustrations on page 45.
Important !
The ground underneath the underlay should be absolutely smooth flat and free of any foreign bodies.
Because of the pressure exerted by the water, even the smallest bump will be visible underneath the liner. After clearing
the ground, spread a layer of sand mixed with cement (1 part cement to 7 parts sand) over the floor of the pool and
compact it. Unfold the underlay in the pool taking care to line it up correctly with the corners. Smooth out any wrinkles.