Operation
18 / 43
51500024
V2
GB
Color:
Description
red
Constant or maximum current phase (IUIa).
Flashing red (4s ON - 1s OFF)
Voltage regulation phase (IUIa).
Red and flashing green (4s ON - 1s OFF)
Overloading phase (IUIa).
Flashing green (4s ON - 1s OFF)
Waiting phase (for equalization) (IUIa).
green
Loading finished (with CU1 BA2)
Flashing green (4s ON - 1s OFF)
Equalizing pulse and floating
Green and red flash together.
Connection with CanConsolle or S/S HW-SW.
Before putting the installation machine into operation, the safety regulations must be observed and the
maintenance work carried out.
To ensure safe and trouble-free operation of the installation machine, the following daily checks must be
carried out in particular.
4.2
Daily checks
Before the initial start-up and generally before each start-up, all liquid levels (hydraulic oil, wiping water
(optional)) must be checked and refilled if necessary!
4.2.1
Open cover
•
In order to open the cover ②, the unlocking button ①
on the cover ② must first be actuated.
①
②
Summary of Contents for VM-301-KJ-GREENLINE
Page 16: ...General 15 43 51500024 V2 GB 3 2 Survey and construction...
Page 41: ...Maintenance and care 40 43 51500024 V2 GB 7 2 Lubrication plan...
Page 42: ...Maintenance and care 41 43 51500024 V2 GB...
Page 45: ......
Page 47: ......
Page 69: ......