5.2 Commissioning Checklist
√
Item
Info
All Systems
Open External Load Port Disconnect
Open External Grid Port Disconnect
Open External DC disconnect
Open Integrated Grid switch (if
installed)
Open Integrated DC switch
If the DC port is connected to Battery
a.
Measure and verify battery
voltage on battery side of
External DC disconnect in
range
Must be < 600V.
b.
Visually check battery
polarity if possible.
c.
Close External DC
disconnect
Ensure internal DC disconnect is open!
d.
Check polarity of battery
voltage on terminal blocks
inside GTIB-30
24V Power supply inside GTIB-30 will
power up if batteries sufficiently charged.
e.
Close integrated battery
switch
If DC port is connected to PV array
a.
Measure and verify PV
voltage on PV array side of
External DC disconnect
Must be <600V
b.
Visually check PV polarity if
possible
c.
Close External DC disconnect
d.
Check polarity of PV voltage
on terminal blocks inside
GTIB-30
e.
Close integrated DC
disconnect
Summary of Contents for GTIB-30
Page 1: ...Clean power made simple GTIB 30 Installation Manual ...
Page 2: ...www princetonpower com 4411 0011 Rev 2 0 April 1st 2014 ...
Page 11: ...About this Manual 4411 0011 Rev 2 0 xi This page intentionally left blank ...
Page 15: ...Contents 4411 0011 Rev 2 0 15 This page intentionally left blank ...
Page 16: ...1 Introduction ...
Page 18: ...2 System Overview and Configurations ...
Page 31: ...3 Pre Installation ...
Page 36: ...GTIB 30 Installation Manual UL 36 4411 0011 Rev 2 0 This page intentionally left blank ...
Page 37: ...4 Wiring Instructions ...
Page 56: ...GTIB 30 Installation Manual UL 56 4411 0011 Rev 2 0 This page intentionally left blank ...
Page 57: ...5 Commissioning Sequences ...
Page 61: ...GTIB 30 Installation Manual UL 4411 0011 Rev 2 0 61 This page intentionally left blank ...
Page 62: ...A GTIB 30 kW Specifications ...
Page 65: ...GTIB 30 Installation Manual UL 4411 0011 Rev 2 0 65 This page intentionally left blank ...
Page 66: ...B Return Material Authorization Contact and Product Information ...
Page 69: ...GTIB 30 Installation Manual UL 4411 0011 Rev 2 0 69 This page intentionally left blank ...