516514
45
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
32. LINT FILTER
(Figure 32)
a. Open loading door and remove screw from end
of lint filter.
b. Lift lint filter out of air duct, paying close
attention to orientation.
IMPORTANT: When installing lint filter, be sure to
install the filter with the words facing the front of
the dryer. If filter is installed backwards, lint will
accumulate in exhaust system, which can adversely
affect dryer performance.
33. LOADING DOOR AND DOOR HINGE
a. Open loading door.
b. Remove screws holding loading door to hinges.
Refer to Figure 32.
Figure 32
D306SE3A
HINGE
ATTACHING
SCREWS
LINT FILTER
ATTACHING
SCREW
LOADING DOOR
ATTACHING
SCREWS
LINT
FILTER
FRONT
BULKHEAD
Summary of Contents for DAM 9
Page 1: ...DAM 9 SERVICE MANUAL INDUSTRIAL DRYERS PUBLICATION DATE 02 01 516514 ...
Page 2: ......
Page 127: ......
Page 128: ......