Installation Location Guidelines
When identifying an installation location of a PrimexEVENT Bell Controller device, consider the following guidelines.
Guidelines
Requires a hardwired connection from the Bell Controller device terminal block to an existing PA or bell system - the two must be in
close proximity to each other.
Wireless network use - the installation location has adequate wireless signal strength.
Wired Ethernet use - a network port jack is located in close proximity to the installation location.
Power over Ethernet (PoE) use - a network port jack is located in close proximity to the installation location and is PoE compliant.
AC power - an outlet is within 5 feet of the installation location.
Installation location is easily accessible for maintenance and clear from obstructions.
Note:
The device is shock and vibration resistant; however, be careful not to drop or install the device in a location where it could be
exposed to excessive vibration.
16
PrimexEVENT Series - Bell Controller Installation Guide