4.2.4 Fibre Channel Connection in the Chassis
This section explains the LAN connection in the chassis for server blades and FC Pass-Thru Blades.
When a Fibre Channel Expansion Board is installed in the server blade and FC Pass-Thru Blade has
been installed in the chassis, the server blade and Fibre Channel port of the FC Pass-Thru Blade are
connected as follows in the chassis. When installing a server blade or a FC Pass-Thru Blade, refer to the
following diagram and install SFP modules to the correct position.
■
For BX620 S2 / BX620 S3 Server Blade
• Network blade slot 3
• Network blade slot 4
Network blade slot 3
Port
1 2 3 4 5 6 7 8 9 10
Server blade slot 10
1 2
Server blade slot 9
1 2
Server blade slot 8
1 2
Server blade slot 7
1 2
Server blade slot 6
1 2
Server blade slot 5
1 2
Server blade slot 4
1 2
Server blade slot 3
1 2
Server blade slot 2
1 2
Server blade slot 1
1 2
Network blade slot 4
Port
1 2 3 4 5 6 7 8 9 10
Server blade slot 10
1 2
Server blade slot 9
1 2
Server blade slot 8
1 2
Server blade slot 7
1 2
Server blade slot 6
1 2
Server blade slot 5
1 2
Server blade slot 4
1 2
Server blade slot 3
1 2
Server blade slot 2
1 2
Server blade slot 1
1 2