Operating
controls
and
operation
04/2015
S.
40
6.
Operating
controls
and
operation
6.1
Work
prior
to
first
start
‐
up
The
installation
site
must
meet
the
specifications
in
chapter
3
and
4.
Manufacturer's
project
documentation
and
connection
diagrams
are
enclosed
with
this
plant.
The
machine
must
be
set
up
and
connected
in
accordance
with
this
documentation.
Level
the
machine
horizontally
using
a
spirit
level.
Leave
sufficient
clearance
around
the
ma
‐
chine
for
industrial
trucks
to
be
able
to
move
easily.
Label
the
manoeuvring
areas
and
hazard
areas
to
ensure
the
smooth
running
of
the
machine.
Screw
the
panel
which
is
part
of
the
scope
of
delivery,
the
"bale
slide"
(1),
to
the
under
‐
side
of
the
channel.
The
correct
electrical
connection
must
be
made
or,
respectively,
checked
by
an
electrician.
The
applicable
VDE
regulations
and/or
the
regulations
of
the
country
in
which
the
machine
is
operated
must
be
observed.
The
enclosed
wiring
diagrams
of
PRESTO
must
also
be
observed.
Now
carry
out
the
following
checks:
•
Ensure
that
it
is
not
possible
to
damage
the
electric
power
supply
cable
by
running
over
it,
crushing
or
pulling
it.
•
Check
all
hydraulic
pipes
and
screws
for
snug
seat
and
obvious
damage
•
Check
that
all
screw
connections
are
tightened.
•
Check
the
electrical
installation.
•
Check
that
all
safety
devices
are
working
properly
(see
chapter
Maintenance).
Do
not
start
up
the
plant
if
a
safety
device
does
not
work
properly.
The
operating
personal
(plant
manager)
must
have
read
and
understood
the
operating
manual
before
the
fist
start
‐
up.