Preface
04/2015
S.
4
1.
Preface
1.1.
Introduction
Dear
customer
Please
read
this
operating
manual
carefully
before
putting
the
machine
into
operation
in
order
to
ensure
that
it
is
used
safely
and
efficiently.
The
operating
manual
contains
all
the
details
for
operating
and
servicing
the
channel
baling
press.
It
must
therefore
always
be
kept
in
the
designated
place.
Chapters
1
to
10
contain
information
on
the
standard
features.
Optional
extras,
as
far
as
they
are
installed,
are
dealt
with
in
chapter
11.
Other
essential
parts
are:
•
Electrical
and
circuit
diagrams,
•
Assembly
or
layout
diagram
•
Declaration
of
Conformity
or
alternatively
Declaration
of
Incorporation
In
principle,
every
machine
is
supplied
with
a
Declaration
of
Conformity.
This
states
that
the
machine
fulfils
the
basic
safety
and
health
requirements
of
the
EC
Directive
on
Machines.
Conformity
in
accordance
with
EC
directive
2006/42/EEC
In
the
event
that
no
Declaration
of
Conformity
is
issued,
the
attached
EC
Declaration
of
Incorporation
for
incomplete
machines
states
with
which
additional
components
the
machine
must
be
assembled
before
it
is
put
into
operation.
Until
the
machine
has
been
completely
assembled,
commissioning
of
individual
components
is
forbidden.
If
maintenance
tasks
have
been
neglected
or
performed
incorrectly,
we
can
no
longer
fulfil
our
guarantee
obligations
according
to
our
conditions
of
sale.
All
safety
requirements
must
always
be
met
before
starting
to
operate
the
channel
baling
press.
Every
machine
has
a
nameplate
and
a
brief
manual
instruction
at
the
switchgear
box.
Besides
the
brief
manual
instruction,
the
nameplate
also
contains
important
information
on
the
machine,
for
example
the
machine
type
and
the
machine
number.
Please
be
aware
that
these
brief
instructions
are
not
a
replacement
for
the
operating
manual.
Fig
1:brief
manual
instruction
Please
have
the
information
on
the
nameplate
to
hand
when
talking
to
our
customer
service
department.