
43
Tonnage Load Monitor
(optional)
Operation
Operating the TLM
Once the TLM has been calibrated it is ready for
continuous use. To ready the TLM for load conversions,
follow these four steps: ( Figure 9)
Figure 9
Step 1:
Enter the run mode by switching from CAL
to RUN.
Step 2:
Make sure that the GAIN SET/ZERO switch
is set to ZERO.
Step 3:
Insure that the external probe signal is
turned on before the load is generated
and off after the operation is complete. If
the logic of the probe is reversed, use the
N.C./N.O. switch to invert the probe signal
logic or adjust the probe accordingly.
Step 4:
Set the TRACK/PEAK switch to the desired
mode. While in TRACK mode each
channel’s output will follow the loading
on the sensor as the load on the machine
increases and decreases. In PEAK mode,
the output will increase to the highest load
level and remain at that voltage until the
probe is released.
Summary of Contents for PressCam 8
Page 1: ...PressCam 8 Installation Operations Manual ...
Page 2: ...Rev 5 0 ...
Page 14: ...6 Internal Wiring Diagram 28 101 System Installation ...
Page 15: ...7 Control Box Dimensions 28 102 System Installation ...
Page 16: ...8 Panel Cut Out Dimensions 28 103 System Installation ...
Page 17: ...9 Control Panel Dimensions 28 104 System Installation ...
Page 18: ...10 System Installation External Wiring Diagram 28 105 ...
Page 19: ...11 System Installation I O Board Dimensions 28 106 ...
Page 44: ...36 Tonnage Load Monitor optional Installation T400 Installation ...