21
figure4 figure5 figure6
4. Loosen the bolt of fixed Top cover board, as shown in figure 4, take down Top cover board
5. Loosen the bolt of fixed small board, as shown in figure 5, take down the small board.
6. According to the above approach, dismantle the bolts of fixed right side board. large board.
Left Side board and air intake fencing components, and take down these parts by turns. as
shown in figure
figure7 figure8 figure9
7. As shown in chart 7. dismantle the fixing nut of the axial flow fan blade
(
right-handed nut
)
.
take down axial flow fan
8. Dismantle the bolts of fixed motor and motor holder, takes down the motor and motor
holder, as shown in chart 8.
9. As in figure 9.dismantle the nuts of the junction box cover in fixed A. B system compressor
and tip-off connecting wire 1 and 2 from the compressor.
10. As shown in chart 9, dismantle the bolts of the four-way valve coils on fixed system A. B.
and tip-off four-way valve coil from four-way valve components.
11. Tip-off the tube temperature sensor from A B capillary assembly. and cut out fixed
bandage
(
this step is only for heat pump model.
)
12. As in figure 9, dismantle the compressor earth wire (each one for A. B compressor
)
fixed
on electrical unit holder.
Summary of Contents for GPAC12039
Page 35: ...33 ...
Page 36: ...34 Section 6 Explosion View Model e g ...
Page 38: ...36 Outdoor Unit Model e g ...
Page 43: ...41 b Single Cooling Model ...
Page 44: ...42 Section 9 Service Record Date Page Part Cause Report ...
Page 45: ......