Model PD655 Large Display Process Meter
Instruction Manual
88
Figure 35.
Installing Option Board
Instructions:
1. Disconnect power to the meter prior to removing the front cover.
2. Remove Display Board and detach Board from ribbon cable connector.
3. Remove Main Board from the base by removing four mounting screws.
4. Install Options Board standoff, using provided hex nuts.
5. Connect flexible cable connector J2 to J3 connector on Main Board.
6. Install four mounting screws to secure Options Board to standoffs.
7. Reassemble meter prior to applying power. Front cover may remain off until
programming is completed to allow installation of lockout jumper. See Figure
15, page 29.