33
33
33
A Hot Section Inspection (HSI) is usually done halfway through the basic
TBO interval or when performance loss dictates. This involves splitting the
engine between the compressor and power turbines at “C” Flange. Since it
is generally not necessary to remove the engine from the aircraft during an
HSI, the inspection procedure is both simple and fast.
hot section inspection
A Hot Section Inspection (HSI) is usually done halfway through the basic
TBO interval or when performance loss dictates. This involves splitting the
engine between the compressor and power turbines at “C” Flange. Since it
is generally not necessary to remove the engine from the aircraft during an
HSI, the inspection procedure is both simple and fast.
hot section inspection
Summary of Contents for PT6A Turboprop
Page 1: ...Key NEW OWNER WISDOm YOUR PT6A turboprop ...
Page 5: ......