7
www.praherplastics.com
Pay attention that the supply voltage is correctly protected and an earth-leakage circuit
breaker ≤ 30 mA is installed.
Only use the equipment in dry rooms, in which no combustible gasses and vapors are
present.
Do not put the equipment into operation immediately if it has been taken from a cold to a
warm area. The thereby developing condensation water could destroy your equipment
If the equipment has visible damages, does not work anymore or has been stored under
adverse conditions for longer periods, then it is to be expected that a safe operation is no
more possible. In this case the equipment is to be secured against unintentional start-up
and if necessary to be decommissioned.
Live parts can be uncovered when opening the cover or removing parts. Before an
alignment, maintenance, a repair or change of parts or devices, the equipment must be
separated from all voltage supplies, if opening the equipment is necessary. If after that an
alignment, maintenance or a repair on the opened equipment under voltage is inevitable,
it may only be done by experienced, skilled staff, which has knowledge of the associated
dangers and/or the relevant regulations.
Capacitors in the equipment can still be charged, even if the equipment is separated from all
voltage supplies.
Assembly and/or disassembly of the valve only in a pressure-free status (i.e. empty piping
beforehand)
Valve flow and/or direction of flow must be considered.
Each person involved in the operation and maintenance of the equipment
must have read and understood the present operation manual!
It is for your own safety!
Summary of Contents for Aquastar Comfort 1001
Page 1: ...Zertifiziert nach certified acc to EN ISO 9001 2008...
Page 4: ...www praherplastics com 4...
Page 18: ...www praherplastics com 18 16 8 Datum und Uhrzeit einstellen...
Page 21: ...21 www praherplastics com 19 Anschlussplan f r Pumpe...
Page 29: ...29 www praherplastics com Notizen Notes...
Page 32: ...www praherplastics com 4...
Page 46: ...www praherplastics com 18 16 8 Setting of date and time...
Page 49: ...21 www praherplastics com 19 Connection diagram for pump...
Page 57: ...29 www praherplastics com Notes...
Page 58: ...www praherplastics com 30 Notes...
Page 59: ...31 www praherplastics com Notes...
Page 60: ...Praher Plastics Austria GmbH BA DEEN 15 02 182 C 90377A...