13
www.praherplastics.com
14.1 Time of activation of backwash cycle
Example:
Backwash every Monday 09:15
set switch S2 to switch point 7 days and
turn on the Aquastar at 09:15 (press „ON“ button on the keyboard)
In order to alter the time of activation, just press the “TEST BUTTON” on the keyboard at the
wanted activation time.
Example:
Change activation from Monday 09:15 to Friday 08:00
„TEST“ Button at the keyboard on Friday 08:00
15 Setting of the electric pressure switch
The operating pressure in the valve is measured by an electronic pressure switch. The
triggering by pressure is set with the switch S3, S4 at the control board. In order to change
the triggering pressure, turn the arrow (by using a screwdriver) clockwise or anti-clockwise
until the arrow points to the requested figure (see chart).
Changeover 01 from 0,4
– 1,9 bar
Changeover 02 from 2
– 5,75 bar
Pos.
pressure (bar)
Changeover 01 Changeover 02
0
0,4
2,0
1
0,5
2,25
2
0,6
2,5
3
0,7
2,75
4
0,8
3,0
5
0,9
3,25
6
1,0
3,5
7
1,1
3,75
8
1,2
4
9
1,3
4,25
A
1,4
4,5
B
1,5
4,75
C
1,6
5
D
1,7
5,25
E
1,8
5,5
F
1,9
5,75
S4
The pressure values are tested and set but can slightly
vary due to manometer tolerances!
Pressure Switch
Summary of Contents for Aquastar Comfort 1001
Page 1: ...Zertifiziert nach certified acc to EN ISO 9001 2008...
Page 4: ...www praherplastics com 4...
Page 18: ...www praherplastics com 18 16 8 Datum und Uhrzeit einstellen...
Page 21: ...21 www praherplastics com 19 Anschlussplan f r Pumpe...
Page 29: ...29 www praherplastics com Notizen Notes...
Page 32: ...www praherplastics com 4...
Page 46: ...www praherplastics com 18 16 8 Setting of date and time...
Page 49: ...21 www praherplastics com 19 Connection diagram for pump...
Page 57: ...29 www praherplastics com Notes...
Page 58: ...www praherplastics com 30 Notes...
Page 59: ...31 www praherplastics com Notes...
Page 60: ...Praher Plastics Austria GmbH BA DEEN 15 02 182 C 90377A...