![Powerware BPIV Installation & Operation Manual Download Page 23](http://html1.mh-extra.com/html/powerware/bpiv/bpiv_installation-and-operation-manual_1592093023.webp)
Powerware BPIV (10 kVA--30 kVA) Installation and Operation
164201406 Rev. C 013004
1--3
1.1.5 Inspecting and Unpacking Each Cabinet
The first task in preparing for installation is inspecting and unpacking the UPS
sections. The UPS and accessory cabinets are shipped bolted to wooden pallets,
as shown in Figures 1---1 or 1---2, and protected with outer protective packaging
material.
Figure 1---1. Powerware BPIV (10 kVA---15 kVA) UPS Cabinet as Shipped on Pallet
Summary of Contents for BPIV
Page 1: ...www powerware com BPIV INSTALLATION OPERATION MANUAL UPS 10 15 kVA 20 30 kVA...
Page 263: ......
Page 264: ...164201406 Rev C 164201406C...