DESCRIPTION:
DATE:
DRAWING NO:
10 of 14
SHEET:
REVISION:
C
013004
NOTE: Customer ground, size 1/0, can be
run in any conduit listed in Tables P
through R.
POWER WIRING INSTALLATION NOTES
164201406---1
A---11
Powerware BPIV (10 kVA--30 kVA) Installation and Operation
164201406 Rev. C 013004
Table N. Options Cabinet Power Cable Terminations Powerware BPIV (10 kVA---15 kVA)
Terminal Function
Terminal
Function
Size of Pressure
Termination
Tightening Torque
N-M (lb-in.)
Type
Screw
AC Input to UPS
R tifi
T
f
L1
Phase A 1 --- #14---#2
#2 --- 5.6 (50)
#4 #6
5 0 (45)
p
Rectifier Transformer
(TB1)
L2
Phase B 1 --- #14---#2
( )
#4---#6 --- 5.0 (45)
#8 --- 4 5 (40)
Slotted
(TB1)
L3
Phase C 1 --- #14---#2
#8 --- 4.5 (40)
#10---#14 --- 4.0 (35)
AC Input To UPS
Bypass Transformer
L1
Phase A 1 --- #14---#2
Bypass Transformer
(TB1)
L2
Phase B 1 --- #14---#2
#2 --- 5.6 (50)
#4---#6 --- 5.0 (45)
Slotted
(
)
L3
Phase C 1 --- #14---#2
#4 #6
5.0 (45)
#8 --- 4.5 (40)
#10---#14 --- 4.0 (35)
Slotted
N
Neutral
1 --- #14---#2
#10---#14 --- 4.0 (35)
AC Output from
Output Transformer
X1
Phase A 1 --- #14---2/0
2.5-2.9(22-26)
3/16 in. Hex
Output Transformer
to Critical Load
(TB1)
X2
Phase B 1 --- #14---2/0
2.5-2.9(22-26)
3/16 in. Hex
(TB1)
X3
Phase C 1 --- #14---2/0
2.5-2.9(22-26)
3/16 in. Hex
N
Neutral
3 --- #14---2/0
2.5-2.9(22-26)
3/16 in. Hex
Customer Ground
Ground
Ground
2 --- #14---1/0
5.6 (50)
Slotted
Table O. Options Cabinet Power Cable Terminations Powerware BPIV (20 kVA---30 kVA)
Terminal Function
Terminal
Function
Size of Pressure
Termination
Vendor
Tightening Torque
N-M (lb-in.)
Type
Screw
AC Input to UPS
L1
Phase A 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
p
Rectifier Transformer
(TB1)
L2
Phase B 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
(TB1)
L3
Phase C 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
AC Input To UPS
Bypass Transformer
L1
Phase A 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
Bypass Transformer
(TB1)
L2
Phase B 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
(TB1)
L3
Phase C 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
N
Neutral
1 --- #4---4/0
Entrelec
3.2-3.7(28-33)
6 mm
Allen
AC Output from
Output Transformer
X1
Phase A 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
Output Transformer
to Critical Load
X2
Phase B 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
to Critical Load
(TB1)
X3
Phase C 1 --- #14---1/0
Entrelec
2.5-2.9(22-26)
Slotted
N
Neutral
1 --- #4---4/0
Entrelec
4-6(35-52)
6 mm
Allen
Customer Ground
Ground
Ground
2 --- #14---1/0
N/A
5.6 (50)
Slotted
Summary of Contents for BPIV
Page 1: ...www powerware com BPIV INSTALLATION OPERATION MANUAL UPS 10 15 kVA 20 30 kVA...
Page 263: ......
Page 264: ...164201406 Rev C 164201406C...