11
3.3
Install the Unit
Always keep 200 mm of free space behind the UPS rear panel.
Check that the indications on the name plate located on the top cover of the UPS
meets to the AC-power source and the true electrical consumption of the total load.
1.
Connect the UPS input socket
to the AC-power source using
the cable of the protected
equipment.
2.
Connect the loads to the UPS
using the cables.
Note: The UPS charges the battery as soon as it is connected to the AC-power source,
even if button is not pressed.
Once the UPS is connected to the AC-power source, 8 hours of charging are required
before the battery can supply the rated backup time.
Summary of Contents for 10122192
Page 10: ...5 2 2 Rear panels Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS ...
Page 11: ...6 Tower 3K Tower 3KS ...
Page 12: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS 36V 72V 5 5 8 8 10 5 3 1 7 8 4 6 2 13 11 ...
Page 20: ...15 2k 3k 3 4 2 RT models ...
Page 40: ......
Page 46: ...8 1 USV Schaltdiagramm 33 8 2 USV Spezifikation 33 ...
Page 51: ...5 2 2 Rückseiten Tower 1K 1KS 1 5K 1 5KS Tower 2K 2KS Schuko Thai Schuko Thai ...
Page 52: ...6 Tower 3K Tower 3KS Schuko Thai Schuko Thai ...
Page 53: ...7 Tower EBM RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Page 61: ...15 2k 3k 3 4 2 RT Modelle ...
Page 91: ...5 2 2 Panneaux arrières Tour 1K 1KS 1 5K 1 5KS Tour 2K 2KS Schuko Thai Schuko Thai ...
Page 92: ...6 Tour 3K Tour 3KS Schuko Thai Schuko Thai ...
Page 93: ...7 MBE en Tour RT 1K 1KS 1 5k 1 5KS RT 2K 2KS ...
Page 101: ...15 2k 3k 3 4 2 Modèles RT ...
Page 114: ...28 ...