Place the lead acid batteries onto each shelf as shown
in figure11 and 12. For the 3kWh unit place 4 total
batteries. For the 4kWh unit place 6 total batteries.
v
Plug the battery leads into the connectors inside the
Powervault. Insert the plastic end into the Powervault
unit placing the connections on top of each other.
Each connector should click into place. This will be
the case on each shelf.
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
PV1_A00_8_Full 500 Assembly with Batteries
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
PV1_A00_8_Full 500 Assembly with Batteries
FIGURE 11
Battery installation for 3kWh & 4kWh units.
FIGURE 12
Battery installation for 4kWh units only.
Note: The powervault will not function properly if
only 1 battery is plugged in per shelf.