Camshaft and Timing Gear Train
02
050
16
RG,RG34710,191
–19–25OCT00–11/14
RG10243
–UN–30JUL99
Removing JDG969A Camshaft Holder
A—JDG969A Camshaft Holder
9. Remove JDG969A Camshaft Holder (A) from front face
of camshaft.
RG,RG34710,191
–19–25OCT00–12/14
RG8286A
–UN–06DEC97
Installing Camshaft Thrust Ring
A—Camshaft Thrust Ring
10. Install a new thrust ring gasket. Lubricate O-ring with
clean engine oil and install camshaft thrust ring (A)
and tighten cap screws to specifications.
Specification
Camshaft Thrust Ring-to-Head—
Torque
35 N•m (26 lb-ft)
.............................................................................
Continued on next page
CTM100 (06APR04)
02-050-16
P
OWER
T
ECH
10.5 L & 12.5 L Diesel Engines
040604
PN=256
Summary of Contents for 6105ADW
Page 16: ...Contents 01 CTM100 06APR04 01 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 50: ...Contents 02 CTM100 06APR04 02 4 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 4 ...
Page 334: ...Contents 03 CTM100 06APR04 03 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 350: ...Contents 04 CTM100 06APR04 04 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 376: ...Contents 05 CTM100 06APR04 05 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 412: ...Contents 06 CTM100 06APR04 06 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...