Camshaft and Timing Gear Train
02
050
25
RG,RG34710,196
–19–25OCT00–7/7
17. Install single nut and washer against JDG968-2
Bushing Installer. Put wrench on double nut and push
bushing in with wrench on single nut.
18. No. 3 Bushing:
NOTE: Install bushing No. 4 before installing bushing No.
3.
Install JDG968-2 Bushing Installer and JDG968-4
Alignment Sleeve with bushing in front of tower No. 5
and JDG968-3 Guide in rear of No. 6 tower.
19. Install 313793 Forcing Screw with double nut toward
rear of engine.
20. Use a 152.4 mm (6.0 in.) extension with ratchet to
reach double nut.
21. Install a new spring pin in towers 3 and 5 (bushing
locations 2 and 3).
CTM100 (06APR04)
02-050-25
P
OWER
T
ECH
10.5 L & 12.5 L Diesel Engines
040604
PN=265
Summary of Contents for 6105ADW
Page 16: ...Contents 01 CTM100 06APR04 01 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 50: ...Contents 02 CTM100 06APR04 02 4 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 4 ...
Page 334: ...Contents 03 CTM100 06APR04 03 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 350: ...Contents 04 CTM100 06APR04 04 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 376: ...Contents 05 CTM100 06APR04 05 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...
Page 412: ...Contents 06 CTM100 06APR04 06 2 POWERTECH 10 5 L 12 5 L Diesel Engines 040604 PN 2 ...