TOOLS REQUIRED:
7/16”, 1/2”, 9/16", and 5/8” sockets and
ratchets, block(s) of wood (minimum of 6” tall).
Refer to the parts list on page 37.
WHEEL INSTALLATION
1. Block up end of generator opposite the fuel tank cap to
install wheel kit.
2. Insert wheel spacer
(item 45)
into the center of the wheel
(item 31).
3. Slide 3/8 x 4.25” bolt
(item 35)
and 3/8 washer
(item 47)
through the wheel
(item 31)
, then through the wheel
bracket on the carrier, with the offset side of the wheel hub
against the wheel bracket.
4. Thread 3/8 nyloc nut
(item 36)
onto the bolt and tighten to
securely clamp the wheel assembly to the tubing.
5. Repeat above instructions for the remaining wheel.
FOOT INSTALLATION
1. Assemble the rubber feet
(item 32)
to the foot bracket
(item 27)
using a 1/4-20 x 1.5” bolt
(item 29)
. Thread a
1/4 washer
(item 39)
and a 1/4 nyloc nut
(item 13)
to the
bolt to secure the assembly.
Caution: Do not over
tighten so that the foot material collapses.
2. Blocking up the alternator side of the generator, place the
foot bracket under the carrier channel. Thread a 5/16-18 x
1” bolt
(item 48)
with a 5/16 washer
(item 34)
through the
mounting holes and thread a 5/16 washer
(item 34)
and a
5/16 nyloc nut
(item 4)
to the bolt to secure the foot
bracket to the carrier.
HANDLE INSTALLATION
1. Place handle
(item 28)
on carrier on same end as feet, as
shown in the diagram.
2. Slide 5/16 x 2.25” bolt
(item 30)
through handle, handle
bracket, and 5/16 washers
(item 41)
as shown in diagram
and secure with 5/16” nyloc nut
(item 4).
Tighten until
handle is securely clamped to the bracket.
LOCKING HANDLE
1. Attach the lanyard
(item 44)
to the release pin
(item 40)
and carrier as shown in the illustration.
2. To lock the handle
(item 28)
in the extended position, align
the holes in the handle bracket with the holes in the carrier
bracket and insert the release pin
(item 40)
.
PORTABILITY KIT INSTALLATION
2
1
40
44
8
Customer Hotline 1-800-445-1805
English